Main stages of repair in the home

Main stages of repair in the apartment.

How to begin repair works of the apartment?

The first stage of the repair of old homes is the destruction and dismantling first off of the worn out walls and partition walls, eliminating the wall and ceiling covering. This phase is among the most "filthy" phases of the repair work.

One more among the most essential and "dusty" works is the window block replacement. It is required to do this first of all because dirt and dust will be unallowable throughout following stages and it is restricted at all to open windows throughout painting and wallpaper works (large drops of the temperature level and wetness are unallowable). After installing windows and windowsills it is needed to load them right away in polyethylene movie and to cover windowsills in addition by the fiberboard (in order to prevent scratches).

The following stage is electrical wiring. Wiring can be installed in walls or along the floor. Circuitry is made inside the pipes to make sure electrical safety and increase dependability. The pipe secures electrical wiring from external damages and enables to replace the wire completely without breaking walls and floor just by inserting the brand-new wire rather of the old one.

House Painting follows the circuitry. The frequent mistake throughout the simultaneous conducting of such works takes place when employees forget to lay out among the cables and home painters have already plastered and smoothed out the wall. As an outcome, extra works are needed to seal goes after on the completed wall. The locations of the feed switch and wall outlet area and their number need to be thought-out beforehand. The plan of power wiring is usually included into the design project.

Later on the system should be all set to service in case of failures. In addition to the wirings, the telephone cable and the TV cable are set out. The power cable need to not be laid out near the telephone and antenna cables to avoid noise pickup and disturbance. The most strange moment is laying out the television cable television. In order to make 2 (or three) TV sets in the apartment the second cable television is often merely "firmly soldered" in parallel, so the cable resistance is lowered. As a result, the display screen quality is weakened, lots of programs can't be received and etc. In order to avoid such circumstance it is required to welcome an expert with special devices. He will determine the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.

image

Painting is the most long-lasting process, that is why it is performed at the same time in all premises, if it is possible. Hold-ups are related to the innovation. Each used layer of the plaster (or filling in completing) need to dry completely before the work will continue.

Works in hygienic arrangements and the kitchen area start concurrently with home painting. It is much better to satisfy so-called "unclean" operate in the first place and all at once. In accordance with the plan of the sanitary professional place welding, wall chasing and pipeline run are performed. Steam radiator admissions are prepared, taps and brackets are installed, but radiators are not installed.

Then operates in hygienic plans are carried out according to the strategy. The bath is installed, then walls are smoothed out and the tile is laid on walls. The following phase is putting together ceiling and laying tiles on the flooring. And at last other sanitary gadgets, mixers and devices are mounted.

After electrical wiring, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of circuitry are insulated and set out into rosette plates. Sockets and breakers are not set up during this phase in order to save their surface look. The surface puttying of walls is carried out concurrently. The technologically precise control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument that measures moisture of the material.

The following phase is the procedure of fill. Fill can be made with different materials-- from normal masonry cement-sand mix to self-aligning floorings. The benefit of the easy mix is its cheapness, the disadvantage is that such mixture is much more difficult aligned at the level and the last dry time of such fill is 40 days, just then the next stage of the deal with floor can be conducted, i.e. the period is too long. Self-leveling self-aligning floors are much more costly, but more technological. Aligning happens almost "instantly" i.e. fluid solution of mix is poured out, then it runs and you get the horizontal surface area. The final dry time is 15 days i.e. you have significant time economy. The system "warm flooring" is installed into the fill. If the so-called "damp processes" are inapplicable the innovation of the dry lining up (the fill innovation) is utilized bases for floorings with adjustable floor battens are mounted.

After fill door boxes and door are set up. Installation of doors must take into the account density of future flooring plumber covering. After setup the door can be taken off its hinges and removed till completion of repair or loaded into polyethylene movie to protect from damages. Concurrently ceiling can be painted and the tile can be laid in that facilities where it was prepared. The tile should be laid on the definitely dry overlay.

Finishing of the floor installing depends on the planned covering. In many cases (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the floor by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to supply the close repairing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood gives the extra heat- and acoustic insulation. After installing of the plywood is completed, wallpaper for painting can be pasted on walls.

In facilities where finish covering of the floor is laminated flooring or parquet hoard, the regular wallpapers are pasted (not for painting) find a plumber near me in the first location. Then the floor covering is mounted.

If finish covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the normal wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The discussed repercussion is connected only with such rushing procedure when the great amount of dust is developed. In spite of the fact that excellent floor mills are geared up with the vacuum, the adequate quantity of dust is sped up on surrounding topics consisting of walls. Dust is extremely acerbic and is badly cleaned off. That is why in order not to harm wallpapers, they are pasted after rushing and in order the parquet do not take in the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the main works can be considered to be ended up. It is left only to install the plinths, ornamental elements, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is necessary to keep in mind that the series of works was noted in basic and can alter depending on the definite circumstance-- the variety of spaces in facility, your resources, peculiarities of the construction of the multilevel properties. It is based on good sense and every person capable of analysis can independently produce such a sequence.